Table of Contents
1 - General
1.1 - Scope
1.2 - Requirements
1.3 - Definitions
2 - Materials
2.1 - Reinforcing Steel Fabrication
2.2-Reinforcement Placement
2.3 - Placement of embedded items
2.4 - Concrete Batching
2.5 - Concrete Properties
3 - Foundations
3.1 - Vertical alignment
3.2 - Lateral alignment
3.3 - Level alignment
3.4 - Cross-sectional dimensions
3.5 - Relative alignment
4 - Cast-in-place concrete for buildings
4.1 - Vertical alignment
4.2 - Lateral alignment
4.3 - Level alignment
4.4 - Cross-sectional dimensions
4.5 - Relative alignment
4.6 - Openings through members
5 - Precast concrete
5.1 - Manufacturing tolerances in linear elements except piles
5.2 - Fabrication tolerances for piles
5.3 - Fabrication tolerances for planar elements
5.4 - Erection tolerances
6 - Masonry
6.1 - Vertical alignment
6.2 - Lateral alignment
6.3 - Level alignment
6.4 - Cross-sectional dimensions
6.5 - Relative alignment
7 - Cast-in-place, vertically slipformed structures
7.1 - Vertical alignment
7.2 - Lateral alignment
7.3 - Cross-sectional dimensions
7.4 - Relative alignment
8 - Mass concrete structures other than buildings
8.1 - Vertical alignment
8.2 - Lateral alignment
8.3 - Level alignment
8.4 - Relative alignment
9 - Canal lining
9.1 - Lateral alignment
9.2 - Level alignment
9.3 - Cross-sectional dimensions
10 - Monolithic siphons and culverts
10.1 - Lateral alignment
10.2 - Level alignment
10.3 - Cross-sectional dimensions
11 - Cast-in-place bridges
11.1 - Vertical alignment
11.2 - Lateral alignment
11.3 - Level alignment
11.4 - Cross-sectional dimensions
11.5 - Relative alignment
12 - Pavements and sidewalks
12.1 - Lateral alignment
12.2 - Level alignment
13 - Chimneys and cooling towers
13.1 - Vertical alignment
13.2 - Diameter
13.3 - Wall thickness
14 - Cast-in-place nonreinforced pipe
14.1 - Wall thickness
14.2 - Pipe diameter
14.3 - Offsets
14.4 - Indentations