Table of Contents
CHAPTER 1—INTRODUCTION
1.2—Scope
CHAPTER 2—NOTATION AND DEFINITIONS
2.1—Notation
2.2—Definitions
CHAPTER 3—SHORING/RESHORING CONSTRUCTION NEEDS
3.1—Use of reshoring
3.2—Types of forming systems
CHAPTER 4—CONSTRUCTION LOADS ON FORMWORK
4.1—Construction loads
4.2—Load combinations
4.3—Typical construction phases
4.4—Construction load distribution
4.5—Application of the simplified method
4.6—Factors affecting the construction load distribution
4.7—Post-tensioning load redistribution
CHAPTER 5—STRENGTH OF CONCRETE SLABS AND FORMWORK
5.1—Early-age concrete material strength development
5.2—Construction load factors
5.3—Early-age strength of concrete slabs
5.4—Serviceability of concrete slabs
5.5—Strength of formwork
CHAPTER 6—CONSTRUCTION EXAMPLES
6.1—Two-way slab construction
6.2—Post-tensioned construction example
CHAPTER 7—REFERENCES