ACI Global Home Middle East Region Portal Western Europe Region Portal
Email Address is required Invalid Email Address
In today’s market, it is imperative to be knowledgeable and have an edge over the competition. ACI members have it…they are engaged, informed, and stay up to date by taking advantage of benefits that ACI membership provides them.
Read more about membership
Learn More
Become an ACI Member
Topics In Concrete
Home > Frequently Asked Questions
In This Section
Frequently Asked Questions
Submit a Question
Search other resources on the ACI website for answers to technical questions
Q. How does the temperature influence curing? A. The higher the temperature, the more rapidly the hydration and pozzolanic reactions proceed. Tests of specimens sealed against loss of moisture show higher early strengths but lower strengths at later ages as the temperature is increased above 5°C (40°F). At temperatures below 5°C (40°F), the rate of hydration is greatly retarded. At freezing temperatures, special admixtures are used for strength development. For temperatures between 5 and 15°C (40 and 60°F), satisfactory results can be obtained by prolonging the moist curing period. For job control specimens cured at 20°C (68°F), lower temperatures at the time of casting and for a few hours thereafter give higher strengths at one to three months. The rapid stiffening in the first few hours and the rapid rate of early strength development under the higher temperatures are detrimental to the later development of strength. References: SP-1(02); ACI 308R-16; ACI 209R-92; ACI 302.1R-15 Topics in Concrete: Concrete Fundamentals; Curing; Placing
Q. How does the temperature influence curing?
A. The higher the temperature, the more rapidly the hydration and pozzolanic reactions proceed. Tests of specimens sealed against loss of moisture show higher early strengths but lower strengths at later ages as the temperature is increased above 5°C (40°F). At temperatures below 5°C (40°F), the rate of hydration is greatly retarded. At freezing temperatures, special admixtures are used for strength development. For temperatures between 5 and 15°C (40 and 60°F), satisfactory results can be obtained by prolonging the moist curing period. For job control specimens cured at 20°C (68°F), lower temperatures at the time of casting and for a few hours thereafter give higher strengths at one to three months. The rapid stiffening in the first few hours and the rapid rate of early strength development under the higher temperatures are detrimental to the later development of strength.
References: SP-1(02); ACI 308R-16; ACI 209R-92; ACI 302.1R-15