Title:
Tilt-Up Construction Costs
Author(s):
F. Thomas Collins and Earl M. Bennetsen
Publication:
Journal Proceedings
Volume:
48
Issue:
11
Appears on pages(s):
197-202
Keywords:
no keywords
DOI:
10.14359/11879
Date:
11/1/1951
Abstract:
Cost data for tilt-up construction are broken down into six componets - casting platform, forming, pouring and curing panels, erection and construction of columns - and compared with a general over-all cost for reinforced brick masonry construction. As with all cost comparisions necessary allowances must be made for local conditions and prices and for changes in the general economic structure. A short form is presented as an aid in estimating costs.