International Concrete Abstracts Portal

  


Title: The Concrete Test Report

Author(s): Luke M. Snell

Publication: Concrete International

Volume: 32

Issue: 12

Appears on pages(s): 41-44

Keywords: compressive strength, 7-day strength, 28-day strength, laboratory testing

DOI:

Date: 12/1/2010

Abstract:
Probably the most common report in the concrete industry is the concrete test report. Typically, a report is sent when a 7-day break is completed. Later, the same report is updated and resent with the 28-day test results. The concrete test report serves one basic purpose: to assure those involved with a project that the right concrete was delivered to the job site. While the format of test reports can vary from one testing laboratory to the next, each will contain the information needed to determine whether the concrete meets the job-site requirements.




  


ABOUT THE INTERNATIONAL CONCRETE ABSTRACTS PORTAL

  • The International Concrete Abstracts Portal is an ACI led collaboration with leading technical organizations from within the international concrete industry and offers the most comprehensive collection of published concrete abstracts.

Edit Module Settings to define Page Content Reviewer