Title:
336.1-01: Specification for the Construction of Drilled Piers
Author(s):
ACI Committee 336
Publication:
Technical Documents
Volume:
Issue:
Appears on pages(s):
22
Keywords:
bored pile; caisson; concrete; drilled pier; foundation; placing; reinforced concrete; reinforcement; slurry; soil; specification; test; tolerance.
DOI:
Date:
10/31/2001
Abstract:
This specification covers requirements for drilled pier construction. It includes delivery, handling, and storage of the casing, excavation, soil testing, placing of concrete and reinforcing steel, and inspection. Drilled piers are sometimes called drilled shafts, caissons, or bored piles.