Title:
Lift Slab Construction: its History, Methodology, Economics, and Applications
Author(s):
M. A. Riusillo
Publication:
Symposium Paper
Volume:
107
Issue:
Appears on pages(s):
59-68
Keywords:
economics; flat concrete plates; history; lift-slab construction; jacking; parting agents; post-tensioning; Construction
DOI:
10.14359/3353
Date:
6/1/1988
Abstract:
The lift-slab method of construction, developed 38 years ago in Texas, has undergone detail changes and modernization of equipment over the years. The basic concept however, remains the same. The flat, concrete floor and roof slabs, usually post-tensioned, are poured one on top of the other at ground level, using the slab on ground as the first soffit form. After all the slabs are poured, they are lifted from above using synchronized hydraulic jacks located on the columns. Floor slabs with as many as 32 columns and 25,000 ftý can be lifted in one piece, while larger floor areas would require sectioning. The economical range of lift-slab construction is from 3 to 20 stories with 5 to 12 story buildings being the most common. The economy is inherent in the fact that reinforcing and concrete work are done at ground level, and that 90 percent of the form work is eliminated. Economy, flexible design, and quality construction, along with clean, safe, and efficient working conditions are all reasons to investigate lift-slab construction for multistory housing, offices, and parking garages.