International Concrete Abstracts Portal

  


Title: Products & Practice Spotlight: Transit Center Construction Stays on Track

Author(s):

Publication: Concrete International

Volume: 37

Issue: 2

Appears on pages(s): 58-59

Keywords: maturity, curing, tag, software

DOI:

Date: 2/1/2015

Abstract:
Accurately monitoring concrete maturity can be critical on large construction projects. To determine the temperature of the concrete after it has been placed, a system containing radio frequency identification tags with built-in sensors, as well as handheld readers and software to interpret the collected data were used during the construction of the Transbay Transit Center in San Francisco, CA. The collected data allowed significant reductions in the construction schedule relative to estimates based on the concrete mixture properties and ambient conditions. Since its installation at the onset of the 3-year project, the system paid for itself three to four times over.




  


ABOUT THE INTERNATIONAL CONCRETE ABSTRACTS PORTAL

  • The International Concrete Abstracts Portal is an ACI led collaboration with leading technical organizations from within the international concrete industry and offers the most comprehensive collection of published concrete abstracts.