Title:
Three bridges built with "in situ" sucessive spans construction method
Author(s):
del Pozo Vindel, F.J.; Arrieta Torrealba, J.M.; Alcalá Sánchez, J.L.
Publication:
ACHE
Volume:
40
Issue:
170
Appears on pages(s):
79 - 82
Keywords:
DOI:
Date:
1/1/1989
Abstract:
This report presents three continuous road bridges built with prestressed concrete. The construction method was the ""in site"" sucessive span with partial prestresses. The maximum span in all of three bridges is over the 50 m and their total length is in the bigest of then up to 530 m. The transversal section is in all cases a unique box girder with a maximum total width of 14,0 m.
ACI International Partner, ACHE Spain, International Partner Access
View Resource »