International Concrete Abstracts Portal

  


Title: Trapagaran Viaduct

Author(s): Revoltós Fort, J.; Llombart Jaques, J. A.; Fernández Vega, J.

Publication: ACHE

Volume: 65

Issue: 274

Appears on pages(s): 233 - 245

Keywords: Cantilever method; Evolutive cross section; Composite construction; Complex geometry; Falsework

DOI:

Date: 1/8/2014

Abstract:
The Trapagaran viaduct was divided into three parts: main viaduct, access viaduct and transition area. The main viaduct is 670 m long with 125 m spans. It is formed by a 35.60 m wide, 5.90 m deep prestressed concrete box cross section. The access viaduct is formed by four separate structures with spans reaching 86 m. Each of the decks is made up of a composite 3.50 m deep box girder. The four branches converge in the transition area displaying complex geometry. The transition area is a prestressed concrete structure of approximately 60 m in span executed on falsework.


ACI International Partner, ACHE Spain, International Partner Access

View Resource »  



  


ABOUT THE INTERNATIONAL CONCRETE ABSTRACTS PORTAL

  • The International Concrete Abstracts Portal is an ACI led collaboration with leading technical organizations from within the international concrete industry and offers the most comprehensive collection of published concrete abstracts.