Title:
Considerations for Deploying Additive Construction
Author(s):
Eric Kreiger
Publication:
Web Session
Volume:
Issue:
Appears on pages(s):
Keywords:
DOI:
Date:
10/25/2020
Abstract:
The results of work US Army Construction Engineering Research Laboratory (CERL) in additive construction not only applies to military construction, but to the construction industry. Through larger demonstrations, CERL has started to confront the struggles that the industry faces. These challenges include continuous equipment operation and maintenance cycles, the development of printable mixes with variable local materials, the development of printing systems that can accommodate variations in materials, design methods, and applicable construction methods.