Title:
Concrete Q&A: Placement of Headed Shear Stud Reinforcement
Author(s):
Publication:
Concrete International
Volume:
44
Issue:
1
Appears on pages(s):
60
Keywords:
assembly, height, upside-down, base rail
DOI:
Date:
1/1/2022
Abstract:
This month’s Q&A discusses requirements of ACI 318-19 on placement of headed shear stud reinforcement and stud assemblies. It focuses on so called “upside-down” shear stud reinforcement and the required overall height of the stud assembly.