Table of Contents
SECTION 1—GENERAL REQUIREMENTS
1.1—Scope
1.2—Units of measurement
1.3—Referenced standards
1.4—Definitions
1.5—Reporting requirements
1.6—Qualifications
SECTION 2—PREPLACEMENT INSPECTION
2.1—General requirements
2.2—Embedments
2.3—Mild steel reinforcement
2.4—Bonded post-tensioned steel reinforcement
2.5—Unbonded post-tensioned steel reinforcement
SECTION 3—PLACEMENT INSPECTION
3.1—Concrete quality
3.2—Conveyance and placement
3.3—Consolidation
3.4—Finishing
SECTION 4—POST-PLACEMENT INSPECTION
4.1—Protection and curing
4.2—Strength test specimens
4.3—Stressing and grouting
4.4—Formwork, shoring, shore removal, and reshoring
OPTIONAL REQUIREMENTS CHECKLIST
Return/Exchange Policy
Printed / Hard Copy Products: The full and complete returned product will be accepted if returned within 60 days of receipt and in salable condition. A 20% service charge applies. Return shipping fees are the customer’s responsibility.
Electronic /Downloaded Products & Online Learning Courses: These items are not eligible for return.
Subscriptions These items are not eligible for return.
Exchanges: Contact ACI’s Customer Services Department for options (+1.248.848.3800 – ACICustomerService@concrete.org).