Description
This specification covers construction of earth-supported cast-in-place concrete pipe (CIPCP). This specification covers construction of CIPCP with a diameter up to 120 in. The Architect/Engineer can make this specification applicable to any project by citing it in the Project Specification. Supplements can be made by designating or specifying individual project requirements as needed. This document must be used in conjunction with ACI 301. Inclusion of this document in a Project Specification, with mandatory checklist items, will provide necessary default values for mandatory checklist items in ACI 301.
Keywords: cast-in-place concrete pipe (CIPCP); circumferential cracking; concrete pipe; longitudinal cracking; no-joint pipe.
Table of Contents
Part 1—General
1.1—Scope
1.2—Definitions
1.3—Referenced standards
1.4—System description
1.5—Submittals
Part 2—Products
2.1—Materials
Part 3—Execution
3.1—Preparation
3.2—Construction
3.3—Repair
3.4—Field quality control
(nonmandatory portion follows)
Notes to Specifier
General notes
Foreword to Checklists
Mandatory Requirements Checklist
Optional Requirements Checklist
Submittals Checklist
Return/Exchange Policy
Printed / Hard Copy Products: The full and complete returned product will be accepted if returned within 60 days of receipt and in salable condition. A 20% service charge applies. Return shipping fees are the customer’s responsibility.
Electronic /Downloaded Products & Online Learning Courses: These items are not eligible for return.
Subscriptions These items are not eligible for return.
Exchanges: Contact ACI’s Customer Services Department for options (+1.248.848.3800 – ACICustomerService@concrete.org).