Table of Contents
INTRODUCTION
CHAPTER 1—GENERAL
1.1—Scope
1.2—Quality assurance
CHAPTER 2—NOTATION AND DEFINITIONS
2.1—Notation
2.2—Definitions
CHAPTER 3—REFERENCED STANDARDS
CHAPTER 4—MATERIALS
4.1—Testing of materials
4.2—Cementitious materials .
4.3—Aggregates
4.4—Water
4.5—Admixtures
4.6—Fibers
4.7—Deformed reinforcement
4.8—Plate steel composite with concrete
4.9—Prestressed reinforcement
4.10—Prestressing anchorages
4.11—Post-tensioning ducts
4.12—Grout
4.13—Metal liners and nonstructural metal components .
4.14—Insulation
4.15—Coating requirements
CHAPTER 5—DESIGN LOADS
5.1—Design loads
5.2—Loading conditions
CHAPTER 6—MINIMUM PERFORMANCE REQUIREMENTS
6.1—General
6.2—Primary concrete container
6.3—Secondary concrete container
6.4—Roof performance criteria
6.5—Other performance criteria
6.6—Concrete quality
6.7—Shotcrete
6.8—Coating design
6.9—Metal components
CHAPTER 7—LOAD FACTORS
7.1—General
7.2—Load factors for ultimate limit state of primary container
7.3—Load factors for ultimate limit state of secondary container
CHAPTER 8—ANALYSIS AND DESIGN
8.1—Methods of analysis
8.2—Design basis
8.3—Foundation design
8.4—Wall design
8.5—Roof design
CHAPTER 9—DETAILING
9.1—General
9.2—Reinforcement details
9.3—Internal prestressing systems
9.4—External prestressing systems
9.5—Concrete containment wall
9.6—Metal components
9.7—Anchorage to concrete
9.8—Liners and coatings
CHAPTER 10—FOUNDATIONS
10.1—General
10.2—Geotechnical investigation
10.3—Design requirements for shallow foundations
10.4—Design requirements for deep foundations
10.5—Ground improvement
10.6—Foundation details
10.7—Foundation performance monitoring details
10.8—Monitoring frequency
10.9—Inspection and testing
CHAPTER 11—CONSTRUCTION REQUIREMENTS
11.1—Construction plan
11.2—Tolerances
11.3—Shotcrete for external prestressing systems
11.4—Post-tensioning
11.5—Winding of prestressed reinforcement: wire or strand
11.6—Forming
11.7—Construction joints
11.8—Concrete embedments
11.9—Coatings
11.10—Welding
CHAPTER 12—COMMISSIONING/DECOMMISSIONING
12.1—Scope
12.2—Testing
12.3—Pressure and vacuum testing
12.4—Purging into service
12.5—Cool-down
12.6—Settlement and movement monitoring
12.7—Liquefied natural gas tank fill methods
12.8—Decommissioning: purging out of service and warm-up
12.9—Recordkeeping
12.10—Nameplate
APPENDIX A—TANK CONFIGURATIONS, DETAILS, AND EXAMPLES
RA.1—Tank configurations
RA.2—Full-containment tanks: typical details
RA.3—Examples of base joint details
APPENDIX B—OFFSHORE CONCRETE TERMINALS
B.1—Scope
B.2—General
B.3—Loads and load combinations
B.4—Concrete and reinforcement materials
B.5—Global and local structural analysis
B.6—Criteria and methodology of concrete sectional design
B.7—Fatigue performance criteria
B.8—Design considerations during construction
transportation, and installation
B.9—Decommissioning
B.10—Design for accidents
APPENDIX C—FATIGUE PERFORMANCE
C.1—Scope
C.2—General
C.3—Fatigue performance criteria
COMMENTARY REFERENCES