Description
This Specification covers materials, preparation, forming, placing, finishing, jointing, curing, and quality control of pervious concrete pavement. Provisions governing testing, evaluation, and acceptance of pervious concrete pavement are included. This Reference Specification can be made applicable by citing it in the Project Specifications. The Architect/Engineer can supplement this reference specification, as needed, by specifying individual project requirements.
Keywords: construction; curing; inspection; jointing; parking lots; testing.
Document Details
Author: ACI Committee 522
Publication Year: 2013
Pages: 7
Categories: Pervious Concrete, Specifications
Formats: Protected PDF/Web View, ePub, or Kindle
This document is Historical
Table of Contents
PART 1—GENERAL
1.1—Scope
1.2—Definitions
1.3—Referenced standards
1.4—Submittals
1.5—Quality control
PART 2—PRODUCTS
2.1—Subbase
2.2—Pervious concrete
2.3—Isolation joint materials
2.4—Forms
2.5—Polyethylene curing sheet
PART 3—EXECUTION
3.1—Subgrade preparation
3.2—Subbase
3.3—Setting formwork
3.4—Batching, mixing, and delivery
3.5—Placing and finishing fixed-form pavement
3.6—Placing and finishing slipform pavement
3.7—Final surface texture
3.8—Edging
3.9—Tolerances
3.10—Curing
3.11—Cold-weather construction
3.12—Jointing
3.13—Opening to traffic
NOTES TO SPECIFIER
General Notes
FOREWORD TO CHECKLISTS
MANDATORY REQUIREMENTS CHECKLIST
SUBMITTALS CHECKLIST
(mandatory portion follows)
Return/Exchange Policy
Printed / Hard Copy Products: The full and complete returned product will be accepted if returned within 60 days of receipt and in salable condition. A 20% service charge applies. Return shipping fees are the customer’s responsibility.
Electronic /Downloaded Products & Online Learning Courses: These items are not eligible for return.
Subscriptions These items are not eligible for return.
Exchanges: Contact ACI’s Customer Services Department for options (+1.248.848.3800 – ACICustomerService@concrete.org).