Description
This Specification covers minimum requirements for the construction of pervious concrete pavement. This Specification covers materials, preparation, forming, lacing, finishing, jointing, curing, and quality control of pervious concrete pavement. Provisions governing testing, evaluation, and acceptance of pervious concrete pavement are included.
Keywords:
construction; curing; inspection; jointing; parking lots; testing
Table of Contents
(mandatory portion follows)
PART 1—GENERAL, p. 2
1.1—Scope, p. 2
1.2—Interpretation, p. 2
1.3—Definitions, p. 2
1.4—Referenced standards, p. 3
1.5—Submittals, p. 3
1.6—Quality assurance and quality control, p. 3
PART 2—PRODUCTS, p. 4
2.1—Subbase, p. 4
2.2—Pervious concrete, p. 4
2.3—Isolation joint material, p. 5
2.4—Forms, p. 5
2.5—Curing materials, p. 5
PART 3—EXECUTION, p. 5
3.1—Subgrade preparation, p. 5
3.2—Subbase, p. 5
3.3—Setting formwork, p. 5
3.4—Batching, mixing, and delivery, p. 5
3.5—Placing and finishing fixed-form pavement, p. 5
3.6—Placing and finishing slipform pavement, p. 5
3.7—Edging, p. 6
3.8—Final surface texture, p. 6
3.9—Jointing, p. 6
3.10—Curing, p. 6
3.11—Hot or cold weather construction, p. 6
3.12—Tolerances, p. 6
3.13—Opening to traffic, p. 6
NOTES TO SPECIFIER (nonmandatory), p. 6
General notes, p. 6
FOREWORD TO CHECKLISTS, p. 6