Notes/Preview
**WITHDRAWN DOCUMENT – This document has been discontinued by ACI and is available for informational purposes only.
Description
This specification is a reference specification that the licensed design professional can make applicable to any construction project by citing it in the project specifications. The licensed design professional supplements the provisions of this reference specification as needed by designating or specifying individual project requirements. This specification covers cast-in-place, normalweight, high-strength concrete in structures that must be designed for moderate to high seismic applications. More specifically, this specification applies to structures:
- Located in Seismic Zones 2, 3, or 4 defined by the Uniform Building
Code;
- Assigned to Seismic Performance Categories C, D, or E of the BOCA/
National Building Code (1993 and subsequent editions) or the Standard
Building Code (1994 or subsequent editions); or
- Seismic Design Categories C, D, E or F of the International Building
Code or the National Fire Protection Association (NFPA) 5000 Building
Construction and Safety Code.
Irrespective of seismic hazard, seismic performance, or design category, these requirements shall apply to normalweight, high-strength concrete in intermediate or special moment frames and intermediate or special
structural walls.
Keywords: curing; high-strength concrete; mixture proportioning; placement;
quality control; seismic application; temperature; trial batch.
Document Details
Author: ACI Committee 93
Publication Year: 2007
Pages: 10
ISBN: 9780870312380
Categories: Seismic & Lateral Forces
Formats: PDF
This document is Withdrawn
Table of Contents
Section 1—General requirements
1.1—Scope
1.2—Definitions
1.3—Referenced standards and cited publications
1.4—Organizations producing codes and standards
Section 2—Materials
2.1—General
2.2—Products
2.3—Execution
Section 3—Mixture proportioning and trial
batches
3.1—General
3.2—Products
3.3—Execution
Section 4—Mixture submittal requirements
4.1—General
4.2—Products
4.3—Execution
Section 5—Preconstruction meetings
5.1—General
5.2—Products
5.3—Execution
Section 6—Ordering
6.1—General
6.2—Products
6.3—Execution
Section 7—Production and delivery
7.1—General
7.2—Products
7.3—Execution
Section 8—Concrete temperature control
8.1—General
8.2—Products
8.3—Execution
Section 9—Placement
9.1—General
9.2—Products
9.3—Execution
Section 10—Curing
10.1—General
10.2—Products
10.3—Execution
Section 11—Sampling and testing
11.1—General
11.2—Products
11.3—Execution
NOTES TO SPECIFIERS
Foreword to checklists
Mandatory requirements checklist
Optional requirements checklist
Submittals checklist
ERRATA INFO
Any applicable errata are included with individual documents at the time of purchase. Errata are not included for collections or sets of documents such as the ACI Collection. For a listing of and access to all product errata, visit the
Errata page.
Return/Exchange Policy
Printed / Hard Copy Products: The full and complete returned product will be accepted if returned within 60 days of receipt and in salable condition. A 20% service charge applies. Return shipping fees are the customer’s responsibility.
Electronic /Downloaded Products & Online Learning Courses: These items are not eligible for return.
Subscriptions These items are not eligible for return.
Exchanges: Contact ACI’s Customer Services Department for options (+1.248.848.3800 – ACICustomerService@concrete.org).