Webinar (April 16): NEX Webinar Series: Investigating ICF Wall Construction Meeting the Requirements of NFPA 285

Currency Display

Your Price:$ 39.00 USD

Member Price: $ 39.00 USD

Price: $ 39.00 USD

Choose Product Language

Choose Product Units


Choose Product Format

Quantity:


Notes/Preview

DATE: Wednesday, April 16

TIME: 1:00 pm to 2:00 pm EDT

Continuing Education Credit: 0.10 CEU (1.0 PDH)

Approved AIA and ICC

Access Period: 30 days

CEU (PDH) REQUIREMENTS:

To earn CEU (PDH) credit, individuals must purchase the webinar and attend the live webinar for the entire duration (or pass the quiz available after the webinar).

Detailed Webinar Instructions

Description

Exterior walls play a critical role in building appearance as well as sustainability and energy performance. Combustible components of exterior walls, however, can pose a significant risk to fire safety if they contribute to fire spread and cause fires to grow in size and intensity. The risks posed to life safety have been under significant focus following high profile, large loss fatal building fires such as Grenfell Tower.

The International Building Code requires exterior wall assemblies with combustible components to limit vertical and lateral flame propagation by meeting NFPA 285 compliance criteria. Recent updates to these codes allow engineering analysis to confirm compliance.

Insulating Concrete Form walls combine reinforced concrete for strength and durability and expanded polystyrene insulation for energy efficiency. The EPS insulation is a combustible component for exterior wall construction.

This presentation reviews the development of NFPA 285 as well as a case study involving testing and engineering analysis of ICF wall assemblies to demonstrate compliance with updated code requirements for fire safety.

 

Document Details

Author: Art Parker

Publication Year: 2025

ISBN:

Categories: Durability, Sustainability, Walls

Formats: Online Learning

Table of Contents

Learning Objectives:

1. Understand what ICFs are and how they are being used in building construction

2. Review historical development of NFPA 285

3. Discuss recent changes to the NFPA 285 test standard, particularly the new Annex B

4. Discuss testing and analysis of two unique ICF wall constructions and analysis

ERRATA INFO

Any applicable errata are included with individual documents at the time of purchase. Errata are not included for collections or sets of documents such as the ACI Collection. For a listing of and access to all product errata, visit the Errata page.

Return/Exchange Policy

Printed / Hard Copy Products: The full and complete returned product will be accepted if returned within 60 days of receipt and in salable condition. A 20% service charge applies. Return shipping fees are the customer’s responsibility.

Electronic /Downloaded Products & Online Learning Courses: These items are not eligible for return.

Subscriptions These items are not eligible for return.

Exchanges: Contact ACI’s Customer Services Department for options (+1.248.848.3800 – ACICustomerService@concrete.org).

Quantity Discounts

This item qualifies for quantity discounts. Discounts are reflected in the shopping cart.
Quantity Discount
10 - 19 25%
20 - 49 35%
50+ copies 50%