ACI PRC-325.13-06(20): Concrete Overlays for Pavement Rehabilitation

Price: $ 72.50 USD

Notes/Preview

Click here to view the first two pages of this publication - pdf file format

Description

This report provides information on the use of concrete overlays for rehabilitation of both concrete (rigid) and asphalt (flexible) pavements. Selection, design, and construction of both bonded and unbonded overlays are discussed. The overlay categories reviewed include bonded concrete overlays, unbonded concrete overlays, white topping overlays, and concrete overlays bonded to asphalt (ultra-thin and thin white topping). Information is also provided on selecting overlay alternatives. Significant portions of this document are based on a synthesis report prepared for the Federal Highway Administration (FHWA) by Applied Pavement Technology, Inc., under contract number DTFH61-00-P-00507. The report, “Portland Cement Concrete Overlays: State of the Technology Synthesis,” is available from the FHWA as publication FHWA-IF-02-045.

Keywords: bond; concrete; joint; overlay; pavement (concrete); rehabilitation; repair.

 

Document Details

Author: ACI Committee 325

Publication Year: 2006

Pages: 39

ISBN: 9780870312137

Categories: Pavements

Formats: PDF

Table of Contents

Chapter 1—Introduction

1.1—Background

1.2—Purpose of report

1.3—Definitions and notation

Chapter 2—Concrete overlay types and construction materials

2.1—Introduction

2.2—Types of concrete overlays

2.3—Overlay materials

2.4—Interface materials

2.5—Incidental materials

2.6—Concrete production, construction, and quality-control issues

Chapter 3—Selection of concrete overlay alternatives

3.1—Introduction

3.2—Effectiveness of different types of concrete overlays

3.3—Selection process

Chapter 4—Bonded concrete overlays

4.1—Introduction

4.2—Design

4.3—Construction

Chapter 5—Unbonded concrete overlays

5.1—Introduction

5.2—Design

5.3—Construction

5.4—Performance

Chapter 6—Conventional whitetopping overlays

6.1—Introduction

6.2—Design

6.3—Construction

6.4—Performance

Chapter 7—Ultra-thin and thin whitetopping overlays

7.1—Introduction

7.2—Design

7.3—Construction

7.4—Performance

Chapter 8—References

8.1—Referenced standards and reports

8.2—Cited references

ERRATA INFO

Any applicable errata are included with individual documents at the time of purchase. Errata are not included for collections or sets of documents such as the ACI Collection. For a listing of and access to all product errata, visit the Errata page.

Return/Exchange Policy

Printed / Hard Copy Products: The full and complete returned product will be accepted if returned within 60 days of receipt and in salable condition. A 20% service charge applies. Return shipping fees are the customer’s responsibility.

Electronic /Downloaded Products & Online Learning Courses: These items are not eligible for return.

Subscriptions These items are not eligible for return.

Exchanges: Contact ACI’s Customer Services Department for options (+1.248.848.3800 – ACICustomerService@concrete.org).