Title:
SP-332: Responsibility in Repair Construction
Author(s):
Publication:
Symposium Paper
Volume:
332
Issue:
Appears on pages(s):
98
Keywords:
SP332
DOI:
10.14359/51719142
Date:
8/8/2019
Abstract:
The responsibilities for parties involved in a repair project may be significantly different than those traditionally encountered in new concrete construction. The new ACI 562 Code Requirements for Assessment, Repair and Rehabilitation of Concrete Buildings and corresponding ACI 563 Specifications for Repair of Concrete in Buildings identify requirements for the Licensed Design Professional and the contractor’s Specialty Engineer during repair programs. Differing lines of authority in repair are presented through industry practice recommendations and case studies, along with identification of industry needs, informing parties engaged in concrete evaluation and repair projects.