Email Address is required Invalid Email Address
In today’s market, it is imperative to be knowledgeable and have an edge over the competition. ACI members have it…they are engaged, informed, and stay up to date by taking advantage of benefits that ACI membership provides them.
Read more about membership
Learn More
Become an ACI Member
Founded in 1904 and headquartered in Farmington Hills, Michigan, USA, the American Concrete Institute is a leading authority and resource worldwide for the development, dissemination, and adoption of its consensus-based standards, technical resources, educational programs, and proven expertise for individuals and organizations involved in concrete design, construction, and materials, who share a commitment to pursuing the best use of concrete.
Staff Directory
ACI World Headquarters 38800 Country Club Dr. Farmington Hills, MI 48331-3439 USA Phone: 1.248.848.3800 Fax: 1.248.848.3701
ACI Middle East Regional Office Second Floor, Office #207 The Offices 2 Building, One Central Dubai World Trade Center Complex Dubai, UAE Phone: +971.4.516.3208 & 3209
ACI Resource Center Southern California Midwest Mid Atlantic
Feedback via Email Phone: 1.248.848.3800
ACI Global Home Middle East Region Portal Western Europe Region Portal
Home > Tools > Frequently Asked Questions
Question: Embedded metals other than reinforcing steel
Question: Curing and curling of concrete slabs over vapor retarders
Question: What nominal maximum sizes of aggregate are recommended?
Question: The effect of joints on the durability of concrete structures
Question: Determining the cause of a crack
Question: Acceptable concrete cracking
Question: Mixture design and strength submittals
Question: Curing Cylinders for Acceptance Testing
Question: Tolerances for floors supporting operable partitions
Question: Increasing the load capacity of a slab-on-ground using an overlay
Question: Strength of concrete
Question: How is the required strength selected, measured, and obtained?
Question: ACI code for evaluating existing buildings prior to repair
Question: Reinforced concrete vs. prestressed concrete
Question: What is the intention of the ACI 318 Building Code?
Question: Simplified design for reinforced concrete buildings
Question: Reinforcement termination in wastewater concrete containment
Question: Governing version of ACI 318
Question: Could a sulfate-resisting cement and slag cement be combined and used for concrete exposed to su...
Question: Slabs-on-ground
Question: Guidance on designing reinforced concrete retaining walls
Question: Knowledge of concrete properties
Question: Tolerances for concrete slabs supporting steel tanks
Question: What is the difference between corrected and uncorrected weight in a concrete mix design?
Question: Minimum concrete cover for balconies with PT cables
Question: Who selects the requirements for concrete for a project?
Question: Is chiseled concrete a common technique for facades
Question: Two-way slabs design, ACI 318 vs. FEM
Question: The intent of the 0.8 factor in Section 17.7.1.2.1 of ACI 318-19
Question: Standard on detailing of concrete reinforcement
Question: Load factors used in the 1963 building code
Question: Substantial structural damage
Question: Design of Slabs-on-ground
Question: If time is not available for preliminary tests, how can the desired strengths be ensured?
Question: Painting the floor
Question: Minimum thickness of bearing walls
Question: Design Properties of Lightweight Concrete
Question: Shear Design Provisions in ACI 318-19
Question: What is calcium-aluminate cement?
Question: Chloride concentration in soil and exposure classes
Question: Are load tests on completed structures ever employed?
Question: Shear reinforcement for beam-column connections
Question: How do the code requirements get to the contractor?
Question: Punching shear check for shear wall foundations
Question: Are stiffness modifiers mandatory in the ACI 318 Code?
Search other resources on the ACI website for answers to technical questions