Table of Contents
Chapter 1—Introduction and scope
1.1—Introduction
1.2—Scope
1.3—History
Chapter 2—Definitions
Chapter 3—Equipment
3.1—Materials storage and measurement
3.2—Mixers
3.3—Equipment condition
Chapter 4—Operations
4.1—General
4.2—Production rates
4.3—Planning
4.4—Materials
4.5—Personnel qualifications
Chapter 5—Applications
5.1—General
5.2—Mixtures with short working times
5.3—Low-slump mixtures
5.4—Latex-modified overlays
5.5—Long unloading times
5.6—Concrete at remote sites
5.7—Making small deliveries
5.8—Precast operations
5.9—Hot weather concreting
5.10—Mining applications
5.11—Grouting and pile filling
5.12—Colored concretes
5.13—Emergency applications
5.14—Controlled low-strength fill
5.15—Fiber-reinforced concrete
5.16—Military applications
Chapter 6—Quality control and testing
6.1—General
6.2—Calibration
6.3—Production testing
Chapter 7—Operational precautions
7.1—General
7.2—Cold weather concrete
7.3—Hot weather concrete
7.4—Aggregate moisture
7.5—Rapid slump loss due to false set
7.6—Use of admixtures
7.7—Freshly mixed concrete properties
Chapter 8—References
8.1—Referenced standards and reports
Appendix A—Sample calibration procedure/forms