Email Address is required Invalid Email Address
In today’s market, it is imperative to be knowledgeable and have an edge over the competition. ACI members have it…they are engaged, informed, and stay up to date by taking advantage of benefits that ACI membership provides them.
Read more about membership
Learn More
Become an ACI Member
Founded in 1904 and headquartered in Farmington Hills, Michigan, USA, the American Concrete Institute is a leading authority and resource worldwide for the development, dissemination, and adoption of its consensus-based standards, technical resources, educational programs, and proven expertise for individuals and organizations involved in concrete design, construction, and materials, who share a commitment to pursuing the best use of concrete.
Staff Directory
ACI World Headquarters 38800 Country Club Dr. Farmington Hills, MI 48331-3439 USA Phone: 1.248.848.3800 Fax: 1.248.848.3701
ACI Middle East Regional Office Second Floor, Office #207 The Offices 2 Building, One Central Dubai World Trade Center Complex Dubai, UAE Phone: +971.4.516.3208 & 3209
ACI Resource Center Southern California Midwest Mid Atlantic
Feedback via Email Phone: 1.248.848.3800
ACI Global Home Middle East Region Portal Western Europe Region Portal
Home > Publications > Collection Online > Collection Search
This Specification addresses requirements for drilled pier construction. Drilled piers are sometimes called drilled shafts, drilled caissons, drilled piers with bells, drilled shafts with bells, or bored piles. This Specification includes: excavation; the use of liners and casing; drilling slurry and concrete free-fall placement methods; testing; reinforcement fabrication and placement; concrete properties and placement; quality control and quality assurance; and acceptance. The successful installation and performance of a drilled pier is fundamentally dependent on the means and methods of construction along with the effects of the site-specific subsurface conditions.
The Collection Online includes all new committee standards and reports released throughout the year. The most recently added include:
PRC-357-24: Design and Construction of Fixed Offshore Concrete Structures - Guide
PRC-334.3-24: Construction of Concrete Shells Using Inflatable Forms - Report
CODE-323-24: Low-Carbon Concrete - Code Requirements and Commentary
CODE-355.5-24: Post-Installed Reinforcing Bar Systems in Concrete—Qualification Requirements and Commentary
SPEC-351.4-24: Cementitious Grout Installation between Foundations and Equipment Bases—Specification
CODE-355.2-24: Post-Installed Mechanical Anchors in Concrete—Qualification Requirements and Commentary
CODE-355.4-24: Post-Installed Adhesive Anchors in Concrete - Qualification Requirements and Commentary
CODE-307-23: Requirements for Reinforced Concrete Chimneys—Code and Commentary
SPEC-336.1-24: Construction of Drilled Piers—Specification
SPEC-351.5-24: Epoxy Grout Installation between Foundations and Equipment Bases—Specification