CHAPTER 1—INTRODUCTION AND SCOPE
1.1—Introduction
1.2—Scope
CHAPTER 2—DEFINITIONS
CHAPTER 3—DOCUMENTS REFERENCED IN CONTRACT DOCUMENTS
CHAPTER 4—RESPONSIBILITIES OF OWNER
4.1—Project responsibility and authority
4.2—Definition of project
4.3—Funding for project
4.4—Real estate, rights of way, permits, and insurance
4.5—Scope and objectives of project
4.6—Project management
4.7—Design and construction team
4.8—Quality assurance program
4.9—Site safety
4.10—Environmental regulations
4.11—Payment
4.12—Project acceptance
4.13—Dispute resolution
4.14—Multiple prime contracts and construction management
CHAPTER 5—LICENSED DESIGN PROFESSIONAL
5.1—Professional services
5.2—Codes and regulations
5.3—Coordination
5.4—Design calculations
5.5—Contract documents
5.6—Specifications
5.7—Field observation
5.8—Tests and inspections
5.9—Owner’s requirements
5.10—Submittals
5.11—Formwork, shoring, reshoring, and temporary structures
5.12—Projects with design delegated to contractor
CHAPTER 6—GENERAL CONTRACTOR
6.1—Construction
6.2—Review contract documents
6.3—Subcontractors
6.4—Payments
6.5—Communication with subcontractors
6.6—Preconstruction meeting
6.7—Project site maintenance
6.8—Qualified personnel
6.9—Quality control
CHAPTER 7—DESIGN/BUILDER
7.1—Design and construction
7.2—Qualified personnel
CHAPTER 8—SUBCONTRACTOR
8.1—Construction
8.2—Review contract documents
8.3—Payments
8.4—Contracts
8.5—Prescriptive and performance specifications
8.6—Safety
CHAPTER 9—SPECIALTY ENGINEERS AND SUBCONTRACTORS
9.1—Retention of specialty engineer
9.2—Specialty engineer
9.3—Specialty subcontractor
CHAPTER 10—CONCRETE MATERIAL SUPPLIER
10.1—Concrete mixtures
10.2—Consistent criteria
10.3—Contract compliance
CHAPTER 11—TESTING/INSPECTION AGENCY
11.1—Contract requirements
11.2—Qualifications
11.3—Preconstruction meeting
CHAPTER 12—CONSTRUCTION MANAGER
12.1—Construction manager
12.2—Construction manager at risk
12.3—Agent construction manager
CHAPTER 13—FAILURE ANALYSIS CONSULTANT
13.1—Independence
13.2—Coordination
13.3—Expertise
13.4—Reliability
13.5—Standards
13.6—Report
CHAPTER 14—MULTIPLE-PRIME CONTRACTOR
14.1—Duties and responsibilities
14.2—Coordination and cooperation
CHAPTER 15—REFERENCES