Table of Contents
Chapter 1— General
1.1—Introduction
1.2—Scope
1.3—History
1.4—Definitions
1.5—Shotcreting processes
1.6—Properties
1.7—Shotcrete applications
1.8—New developments and potential future uses
Chapter 2—Materials
2.1—Introduction
2.2—Delivery, handling, and storage
2.3—Cement
2.4—Aggregate
2.5—Water
2.6—Bonding compounds
2.7—Admixtures
2.8—Reinforcement
2.9—Curing and form coating compounds
Chapter 3—Equipment
3.1—Introduction
3.2—Dry-mix equipment
3.3—Wet-mix equipment
3.4—Air requirements
3.5—Mixing equipment
3.6—Hoses
3.7—Nozzles
3.8—Auxiliary equipment
3.9—Plant layout and operation
3.10—Other uses of shotcrete equipment
3.11—Safety
Chapter 4—Crew organization
4.1—Introduction
4.2—Composition and duties
4.3—Crew qualifications
4.4—Communications
Chapter 5—Preliminary procedures
5.1—Introduction
5.2—Surface preparation
5.3—Formwork
5.4—Reinforcement
5.5—Anchors
5.6—Alignment control
5.7—Joints
5.8—Protection of adjacent surfaces
Chapter 6—Proportioning and preconstruction testing
6.1—Introduction
6.2—Performance versus prescription specification
6.3—Proportioning of shotcrete mixture
6.4—Preconstruction testing
Chapter 7—Batching and mixing
7.1—Introduction
7.2—Batching
7.3—Mixing
Chapter 8—Shotcrete placement
8.1—Introduction
8.2—Special applications and mixtures
8.3—Preliminary procedures
8.4—Shotcrete equipment procedures
8.5—Application of shotcrete
8.6—Finishing
8.7—Tolerances
8.8—Curing
8.9—Hot-weather shotcreting
8.10—Cold-weather shotcreting
8.11—Hazards
Chapter 9—Quality control
9.1—Introduction
9.2—Design and quality control
9.3—Materials
9.4—Application equipment
9.5—Craftsmanship
9.6—Placement techniques
9.7—Inspection
9.8—Testing procedures
Chapter 10—References
10.1—Referenced standards and reports
10.2—Cited references
Appendix—Payment for shotcrete work
A.1—Introduction
A.2—Payment methods
A.3—Factors affecting payment
A.4—Supplementary items
A.5—Methods of measurement
A.6—Pay items