551R-92: Tilt-Up Concrete Structures (Reapproved 2003)

Currency Display

Your Price:$ 75.50 USD

Member Price: $ 44.00 USD

Save $ 31.50 USD, Become a Member

Choose Product Language

Choose Product Units


Choose Product Format


Notes/Preview

**WITHDRAWN DOCUMENT - This document has been discontinued by ACI and is available for informational purposes only.

Description

Tilt-up concrete construction is commonly used in low-rise building construction. This report discusses many of the items that should be considered in planning, designing, and constructing a quality tilt-up project. Major topics discussed include design, construction planning, construction, erection, and finishes.

 

Document Details

Author: ACI Committee 551

Publication Year: 2017

Pages: 46

ISBN:

Categories: Tilt-Up Construction

Formats: PDF

This document is Withdrawn

Table of Contents

Chapter 1: Introduction

1.1 Introduction

1.2 Definition

1.3 History

1.4 Advantages

1.5 Disadvantages

1.6 Scope of report

Chapter 2: Design

2.1 General

2.2 Analysis

2.3 Loads

2.4 Design bending moment

2.5 Bending stiffness

2.6 Examples

2.7 Special design considerations

2.8 Building stiffness

2.9 Tolerances

2.10 Connections

2.11 Sandwich panels

2.14 Lifting analysis

2.15 Temporary bracing

2.16 Architectural/engineering documents

2.17 Reinforcement

2.18 Architectural considerations

Chapter 3: Construction Planning

3.1 Introduction

3.2 Site access and jobsite conditions

3.3 Coordination

3.4 Sequence of construction

3.5 Work platform

3.6 Curing compounds and bondbreakers

3.7 Lifting accessories

3.8 Shop drawings

3.9 Panel casting locations

3.10 Erection subcontractor

3.11 Final closure panel

Chapter 4: Construction

4.1 Introduction

4.2 Site, subgrade, and slab

4.3 Construction practices and workmanship

4.4 Shop drawings

4.5 Materials and equipment

4.6 Supervision

4.7 Casting

4.8 Strip and clean panels

4.9 Seating on foundations

4.10 Backfill

4.11 Wall panel joints

4.12 Safety

4.13 Construction checklist

Chapter 5: Erection

5.1 General Prior to construction

5.2 Prior to erection day

5.3 Safety meeting

5.4 During lift

5.5 Plumbing panels

5.6 Bracing

5.7 Closure panel

Chapter 6: Finishes-(Includes Exposed Aggregate Finish)

6.1 Introduction

6.2 Finish face up

6.3 Finish face down

6.4 Concrete materials

6.5 Method and types of finish

6.6 Cleaning

6.7 Coatings

6.8 Cracking

Chapter 7: References

7.1 Specified and/or recommended references

7.2 Cited references

ERRATA INFO

Any applicable errata are included with individual documents at the time of purchase. Errata are not included for collections or sets of documents such as the ACI Collection. For a listing of and access to all product errata, visit the Errata page.

Return/Exchange Policy

Printed / Hard Copy Products: The full and complete returned product will be accepted if returned within 60 days of receipt and in salable condition. A 20% service charge applies. Return shipping fees are the customer’s responsibility.

Electronic /Downloaded Products & Online Learning Courses: These items are not eligible for return.

Subscriptions These items are not eligible for return.

Exchanges: Contact ACI’s Customer Services Department for options (+1.248.848.3800 – ACICustomerService@concrete.org).