Email Address is required Invalid Email Address
In todayโs market, it is imperative to be knowledgeable and have an edge over the competition. ACI members have itโฆthey are engaged, informed, and stay up to date by taking advantage of benefits that ACI membership provides them.
Read more about membership
Learn More
Become an ACI Member
Founded in 1904 and headquartered in Farmington Hills, Michigan, USA, the American Concrete Institute is a leading authority and resource worldwide for the development, dissemination, and adoption of its consensus-based standards, technical resources, educational programs, and proven expertise for individuals and organizations involved in concrete design, construction, and materials, who share a commitment to pursuing the best use of concrete.
Staff Directory
ACI World Headquarters 38800 Country Club Dr. Farmington Hills, MI 48331-3439 USA Phone: 1.248.848.3800 Fax: 1.248.848.3701
ACI Middle East Regional Office Second Floor, Office #207 The Offices 2 Building, One Central Dubai World Trade Center Complex Dubai, UAE Phone: +971.4.516.3208 & 3209
ACI Resource Center Southern California Midwest Mid Atlantic
Feedback via Email Phone: 1.248.848.3800
ACI Global Home Middle East Region Portal Western Europe Region Portal
Home > Tools > Frequently Asked Questions
Q. How is workability measured and specified? A. The customary measure of workability is slump. ASTM C143 covers the determination of slump. The lowest acceptable slump is normally selected in preference to high slump due to a low w/cm and low amount of cementitious material, which are desirable; it also means less likelihood of segregation. The use of water-reducing admixtures, however, enables the preparation of concretes with a low w/cm and high slump values without adding more cementitious material and water and without segregation. Low slump is necessary in certain applications, such as slip-form paving, where concrete retains a certain shape without the need for formwork. On the other hand, a high-slump concrete may be necessary where complicated forms or closely spaced reinforcement is used. Under such conditions, it may be necessary to require self-consolidating concrete. References: SP-1(02); ACI 238.1R-08; ACI PRC-211.1-22; ACI 301-20; ASTM C143 Topics in Concrete: Concrete Fundamentals; Mixture Proportioning; Placing; Self-Consolidating Concrete; Testing of Concrete
Q. How is workability measured and specified?
A. The customary measure of workability is slump. ASTM C143 covers the determination of slump. The lowest acceptable slump is normally selected in preference to high slump due to a low w/cm and low amount of cementitious material, which are desirable; it also means less likelihood of segregation. The use of water-reducing admixtures, however, enables the preparation of concretes with a low w/cm and high slump values without adding more cementitious material and water and without segregation. Low slump is necessary in certain applications, such as slip-form paving, where concrete retains a certain shape without the need for formwork. On the other hand, a high-slump concrete may be necessary where complicated forms or closely spaced reinforcement is used. Under such conditions, it may be necessary to require self-consolidating concrete.
References: SP-1(02); ACI 238.1R-08; ACI PRC-211.1-22; ACI 301-20; ASTM C143
Topics in Concrete: Concrete Fundamentals; Mixture Proportioning; Placing; Self-Consolidating Concrete; Testing of Concrete
Search other resources on the ACI website for answers to technical questions